So we have a two in one special today. you get to see the progress of Amdon and Brian's basement project. Currently i have 100 days left or i'm 25 weeks and 5 days. don't look any different, huh? And Brian is finishing a portion of the basement. the first pictures is me of course and bri cut a portion of the stair wall out to open it up a bit. the second pic is pretty impressive. right where i'm standing are two turn off valves. since we didn't want three holes in the wall to access the two valves and the grey box (i know it has a name) brian rerouted them to be in one location. the horizontal pipe work was all done by bri. he's the man! and the little window around the grey box will be open when the wall is finished covered by a picture. so access to main water, hose bib and box all together. yea!
Comments
I looked at the second pic before I read the explanation and thought, "why on earth would the plumber do that with the pipes?" well, your plumber-hubby has a rather good reason. good idea.
Impressive Brian, next time we visit you'll have to teach me a few things so I can be a better fixer-upper.